Stevens Croft Power Station
Address:
Steven’s Croft Power Station Visitor Centre
Johnstonebridge Road
Lockerbie
DG11 2SQ
Completion Date: February 2009
Project Information: Two JB Antislip Plus red coloured inserts were specified for the deckboards
by E-on. Red inserts where chosen for the visitor centre because it matched E-on’s
corporate colours. The visitor centre will be used to show people the workings
of the plant, display exhibitions and run induction classes on biomass power stations
and the positive effect they have on the environment. The decking at Steven’s
Croft Power Station Visitor Centre was installed under the covered pedestrian
walkway to the visitor centre along with the main gatehouse. As well as being
a decorative feature, JB Antislip Plus coloured inserts can be used to draw attention
to features such as steps, gradients and edges.







